Environmental
- Chapter 1 Introduction
 - Chapter 2 Background to the Proposed Development
 - Chapter 3 Description of the Proposed Development
 - Chapter 4 Consideration of Reasonable Alternatives
 - Chapter 5 Policy, Planning and Development Context
 - Chapter 6 Population and Human Health
 - Chapter 7 Biodiversity Flora & Fauna
 - Chapter 8 Ornithology
 - Chapter 9 Soils & Geology
 
- Chapter 10 Hydrogeology
 - Chapter 11 Hydrology & Water Quality
 - Chapter 12 Air Quality & Climate
 - Chapter 13 Noise & Vibration
 - Chapter 14 Shadow Flicker
 - Chapter 15 Landscape & Visual
 - Chapter 16 Material Assets – Aviation and Telecommunications
 - Chapter 17 Traffic and Transportation
 - Chapter 18 Archaeological, Architectural and Cultural Heritage
 - Chapter 19 Interaction of Effects
 - Chapter 20 Schedule of Mitigation Measures
 - Table of Contents Volume B EIAR Main Report
 
- Appendix 1.1 Correspondence with An Bord Pleanala
 - Appendix 1.2 Scoping Consultation
 - Appendix 1.3 Community Report
 - Appendix 1.4 Strategic Framework for the Future Use of Peatlands
 - Appendix 2.1 Detailed Site Layout Drawings
 - Appendix 3.1 Construction Environmental Management Plan
 - Appendix 3.2 Bellacorick Proposed Decommissioning Plan
 - Appendix 3.3 WindEurope-decommissioning-of-onshore-wind-turbines 2020
 - Appendix 6.1 – Wind Farms and Health, Reference Studies
 
- Appendix 6.2 – EMF and You
 - Appendix 7.1 Habitat Mapping
 - Appendix 7.2 Bat Survey Report
 - Appendix 7.3 Electronic Fishing Survey Results Report
 - Appendix 7.4 Biodiversity Enhancement Plan
 - Appendix 8.1 Avi-Fauna Data
 - Appendix 8.2 Collision Risk Modelling Report
 - Appendix 8.3 Red Grouse Surveys
 - Appendix 8.4 Viewshed Maps
 - Appendix 8.5 Bird Monitoring Programme
 - Appendix 9.1 Geology Maps
 - Appendix 9.2 Ground Investigation Report (complete)
 - Appendix 9.3 Peat Management Plan
 - Appendix 9.4 Peat Stability Risk Assessment
 - Appendix 9.5 2013 Site Investigation Report
 - Appendix 11.1 Flood Risk Assessment (Substation)
 - Appendix 11.2 Surface Water Management Plan
 - Appendix 11.3 Water Framework Directive Report
 - Appendix 12.1 Ambient Air Quality Standards
 - Appendix 12.2 Dust Management Plan
 - Appendix 13.1 Glossary
 - Appendix 13.2 Noise Meter Calibration Certs
 - Appendix 13.3 Noise Modelling Assumptions and Inputs
 - Appendix 13.4 Tabulated Omni Directional Results – Cumulative
 - Appendix 13.5 Tabulated Omni Directional Results – Proposed Development in Isolation
 - Appendix 13.6 Noise Contour Maps
 - Appendix 13.7 Predicted Noise Levels (Directional)
 - Appendix 14.1 WindProModel Report
 - Appendix 15.1 Visual Impact at Selected Viewpoints
 - Appendix 15.2 VP Location Map
 - Appendix 15.3 cover
 - Appendix 15.3.1 Zone of Theoretical Visibility Tip Height 200m
 - Appendix 15.3.2 Cumulative Theoretical Visibility
 - Appendix 15.3.3 Zone of Theoretical Visibility Hub Height 121m
 - Appendix 17.1 Haul Route Swept Path Analysis Drawings
 - Appendix 17.2 Traffic & Transportation Assessment
 - Appendix 18.1 SMR & RMP Sites in the Study Area
 - Appendix 18.2 Architectural Sites Within the Receiving Environment
 - Appendix 18.3 Legislation Protecting the Archaeological Resource
 - Appendix 18.4 Legislation Protecting the Architectural Resource
 - Appendix 18.5 Bord na Móna Code of Practice
 - Appendix 18.6 Impact Assessment and the Cultural Heritage Resource
 - Appendix 18.7 Mitigation Measures and the Cultural Heritage Resource
 
- VP9 Local Road at Formoyle
 - VP10 N59 at Knockagarravaun
 - VP11 Local Road at Shanvolahan
 - VP12 Local Road at Eskaragh
 - VP13 N59 at Bellacorick Bridge
 - VP14 Junction of N59 and R312 (Western Way)
 - VP15 N59 at Lough Dahybaun
 - VP16 N59 at Dooleeg More
 - VP17 N59 at Crossmolina
 - VP18 N59 at Coolturk
 - VP19 R312 (Western Way) at Derry Lower
 - VP20 Local Road (Western Way) at Derry Upper
 - VP21 Local Road at Keenagh
 - VP22 Local Road (Western Way) at Moyne
 - VP23 Local Road East of Lough Conn
 - VP24 Summit of Nephin
 
